Stainless Steel Aluminum Titanium Milling Turning Machining Parts
Basic Info
Model NO. | Customized |
Customized | Customized |
Material | Metal |
Application | Metal Processing Machinery Parts, Auto and Motorcycle Accessory |
Surface Finish | Anodized/Plated/Customized |
Technics | Machining |
Dimensions | OEM as Your Design |
Processing Time | Leadtime of Mass Production:10-20days |
Transport Package | Standard International Packing |
Specification | Customized |
Origin | China |
Production Capacity | 500000 |
Packaging & Delivery
Package size per unit product 10.00cm * 5.00cm * 5.00cm Gross weight per unit product 0.500kgProduct Description
Product DescriptionSize | Customized |
Finished | Hard Anodized, Anode/ |
Processing Accessory | Centre CNC Lathe/CNC/ |
Trade Methods | EXW, Fob, CIF, CFR, DDP, DDU |
Delivery Time | Leadtime of Samples:3-5days Leadtime of mass production:10-20days |
Tolerance | +/-0.005mm |
Quality Control | 100% Inspect Before Shipment |
Packaged | Boxes, Carton |
Process | Machining, Debur, Anodized |
Color | Black, Clear, Orange, Pink |
Drawing Files | Igs, Step, CAD |
Transport Package | Paper Box/Wooden Box Outside/, Pearl Wool Inside |
Origin | Dongguan Guandong, China |
FAQ
Q1. Are you a factory or trade company?We are a factory located in Dongguan China. Welcome to visit our factory.Q2. What kind of production service do you provide?CNC machining, stamping, injection molding, die casting and assembly.Q3. How about the lead time?Sample: 7 days Mass production: 2-3 weeksQ4. How about your quality?We have got ISO9001:2015 and IATF16949 certificates. We will make the operation instruction once the sample is approved. We will 100% inspect the products before shipment. Transactions can be through Alibaba's trade assurance.Q5. How long should we take for a quotation?Quote for you within 24 hours.Q6. What is your quotation element?Drawings or Sample, Material, Finish, and Quantity.Q7. What is your payment term?Mold: 50% prepaid, balance after sample approval. Goods: 50% prepaid, balance T/T before shipment.